Full or partial decommissions
Support can range from removing selected racks or retired assets to clearing an entire room, cage, or facility.
Data center decommissioning
A data center is more than a room full of equipment. Every project must account for live systems, restricted areas, power, cabling, access, schedules, security, and the people responsible for what stays operational.
Support can range from removing selected racks or retired assets to clearing an entire room, cage, or facility.
Work is coordinated with IT, facilities, security, and other responsible teams to reduce disruption and protect equipment that remains active.
Equipment can be identified by type, manufacturer, model, serial number, asset tag, rack position, quantity, or another agreed level of detail.
Storage media can be removed, securely erased, physically destroyed on-site or off-site, returned, or processed under the organization’s retention policy.
Servers, storage systems, network equipment, rails, racks, power distribution, and related hardware can be de-installed, staged, and loaded.
Assets are directed toward reuse, value recovery, recycling, return, or destruction, with documentation matched to the project scope.
01
We review equipment, locations, access, security, power state, removal boundaries, schedule, staffing, documentation, and disposition requirements.
02
Responsibilities, sequencing, inventory detail, custody, tools, loading, transportation, safety, and escalation contacts are defined.
03
Authorized equipment is identified, disconnected when within scope, removed, inventoried, staged, protected, and loaded methodically.
04
Equipment is processed according to the agreed path, and requested inventories, custody records, recycling records, and data-destruction documentation are delivered.
Rack servers, blade systems, storage arrays, tape libraries, network switches, routers, firewalls, console equipment, telecommunications systems, and associated components.
Server racks, rails, cable-management hardware, power distribution units, battery backups, cabling, monitors, workstations, and other removable technology.
Retired infrastructure may contain sensitive data, identifying labels, proprietary configurations, recoverable components, and significant material value. Custody and disposition should remain clear after the equipment leaves the facility.
Dispo.tech can coordinate transport, secure handling, disassembly, downstream recycling, and reporting as parts of one defined project.
Inventories can include equipment type, manufacturer, model, serial number, asset tag, quantity, and disposition when requested.
Pickup, transfer, vehicle, location, and processing milestones can be documented according to the agreed workflow.
Certificates can identify data-bearing media, serial numbers when available, quantity, and the erasure or destruction method used.
Photographs, completion reports, recycling records, and other evidence can be included when established during scoping.
Potentially, yes. The scope, access, responsibilities, active-system boundaries, schedule, and safety requirements must be reviewed with the responsible IT and facilities teams before work begins.
Power-down and disconnection responsibilities are defined during planning. Equipment should not be assumed safe or authorized for removal until the organization’s responsible personnel confirm its status.
Yes. On-site media removal and physical destruction can be included when practical. Secure off-site processing and documented chain of custody are also available.
Pricing depends on location, equipment volume, access, labor, de-installation, inventory detail, transportation, data requirements, scheduling, documentation, and the potential reuse or material value of the assets.
We’ll define the removal boundaries, custody, data handling, logistics, final disposition, and documentation before anyone touches a rack.
Request a consultation